Selection · turn the product duty into a specification

A useful plate evaporator enquiry

Start with your liquid and what you need to achieve. A short initial message is enough; the following inputs make the later equipment and utility proposal more specific.

Plate-pack ports, process pipework and lower pump connections
Plate and liquid-transfer connections within the evaporation equipment.

Start with the liquid, flow and target

Name the liquid and describe any filtration, clarification or phase separation already provided. Give incoming flow and its units, feed temperature, inlet concentration and target concentrate. State the measurement basis for Brix, mass solids or other concentration data.

If one of these quantities is not yet known, identify the missing input. An initial enquiry does not require a finished process specification. Distinguishing estimated, measured and required values helps the next discussion.

Add the properties that change selection

Include particles or fibres, expected viscosity through concentration, foaming and product-temperature limits. Describe the daily production schedule, product changes and available cleaning supply.

Record the heating, cooling and electrical conditions at the intended equipment location. For TVR, state the motive-steam condition and pressure basis. Attach detailed proprietary drawings only through an agreed route after initial contact.

Information groupUseful details
ProductLiquid, preparation, solids, viscosity and foaming
ConcentrationIncoming flow, inlet and target concentration, measurement basis
UtilitiesHeating, cooling, power and cleaning supply
Equipment scopeInlet, concentrate receiver, layout and site responsibilities

Compare quotations on the same boundary

Separate feed, concentrate and water-removal quantities. Check the included heat-transfer sections, separators, pumps, condenser or vacuum circuit, controls and cleaning connections, plus the documentation and commissioning scope.

Compare any performance or utility commitment at the stated product and operating condition. Reported coconut water project figures are references for those installations; a new equipment proposal needs its own duty and acceptance basis.

YOUR PRODUCT. YOUR PROCESS.

Put the system
to work for your project.

Discuss the liquid, the concentration duty and how the equipment will connect to your operation.

Start an equipment enquiry ↗